[Udemy Course] Quantity Surveying Building Estimation With Cad And Excel by Mudessar Afraz
Salepage : [Udemy Course] Quantity Surveying Building Estimation With Cad And Excel by Mudessar Afraz
Archive : [Udemy Course] Quantity Surveying Building Estimation With Cad And Excel by Mudessar Afraz Digital Download
Delivery : Digital Download Immediately
Description
Completed Course Last Updated: 09/2021
The whole shebang.
Estimate the project using AutoCAD and Excel.
Estimate the entire project (Manual Calculations PDF Drawings Same Project.)
Complete Project Estimation (Same Project Using Plan Swift Software)
Beginner Primavera P6 Training.
We will complete the project in Primavera P6 (Same Project For Which We did Estimation)
Beginners’ MS Project 2019 Training
We will complete the project in MS PROJECT (Same Project For Which We did Estimation)
Excel Training for Novices
AutoCAD Training For Novices
Welcome to the online Quantity Surveying/Building Estimation training course. It focuses on the actual application of estimation using Auto Cad and Microsoft Excel.
This is a field-oriented course with real-world examples and a full-fledged real-world project for better comprehension.
You will be able to estimate any building project after successfully completing this course (From Foundation To Finishing)
Major topics covered in this course include:
AutoCAD Substructure Quantity (Isolated Footing)
Quantity of Excavation
Calculations for Formwork
Quantity in Concrete
Count of Sloped Footings Using AutoCAD
Quantity of Excavation
Calculations for Formwork
Quantity in Concrete
Raft Foundation Quantity Calculated Using AutoCAD
Quantity of Excavation
Calculations for Formwork
Quantity in Concrete
AutoCAD Quantity of Different Items in Superstructure
S.S. Column (Formwork, Concrete)
Beams of various grades (Formwork ,Concrete )
On Grade Slab (Formwork , Concrete)
Top Beam And Lintel (Formwork , Concrete)
Slab (Concrete And Formwork)
Brick Manufacturing
Plastering Services
Work with Tile and Marble
Paint Functions
Manual Calculations For Substructure Quantity (Isolated Footing) PDF File Or Hard Copy Of Drawings
Quantity of Excavation
Calculations for Formwork
Quantity in Concrete
Quantity of various items in the superstructure through PDF file, manual calculations
S.S. Column (Formwork ,Concrete)
Beams of various grades (Formwork ,Concrete )
On Grade Slab (Formwork , Concrete)
Top Beam And Lintel (Formwork , Concrete)
Slab (Concrete And Formwork)
Brick Manufacturing
Plastering Services
Work with Tile and Marble
Paint Functions
Substructure Quantity (Through Planswift)
Quantity of Excavation
Calculations for Formwork
Quantity in Concrete
Quantity of various items in the superstructure (Through Planswift)
S.S. Column (Formwork, Concrete)
Beams of various grades (Formwork, Concrete )
On Grade Slab (Formwork, Concrete)
Top Beam And Lintel (Formwork, Concrete)
Slab (Concrete And Formwork)
Brick Manufacturing
Plastering Services
Work with Tile and Marble
Paint Functions
Schedule for bar bending:
Isolated Footing Bar Bar-bending Schedule
-Raft Foundation Bending Schedule Bar-bending Schedule Of Column Necks And Columns Bar-bending Schedule Of Beams
-bending Stairs Bar Schedule Slab Bending Schedule Two Way Slab Bending Schedule
Rate Analysis of Various Works:
Excavation Rate Analysis
Plain Cement Concrete Rate Analysis (P.C.C)
Concrete Reinforcement Rate Analysis (Column Beam And Slab)
Masonry Work Rate Analysis
Plaster Work Rate Analysis
Tile Work Rate Analysis
Paint Work Rate Analysis
Material Declaration:
Excel Material Statement
Quantity Bill (B.O.Q)
Bill of Quantities for a Project Using CSI Codes
Payment Methods to Contractor
Secured Interim Payment Advance Payment Mobilization of Petty Advances Advance Procedure For Creating Interim Payments From Scratch In Excel
Beginner Primavera P6 Training
Because we are working on the same project in Primavera, this training is intended for those who are new to either planning or Primavera.
Complete the project in Primavera P6 using MS Excel.
Making an Activity List in Microsoft Excel.
In MS Excel, add manpower and their productivity. Add duration to activities based on productivity.
Primavera Project Creation P6
Importing All Activities From Excel To P6 W.B.S And Activity Relationship
Making and Allocating Resources to Activities (Work And Material Resources)
Update The Project Based On Actual (Time And Cost)
Beginner MS PROJECT Training
Because we are doing the same project in MS Project, this training is intended for those who are new to planning or MS Project.
Complete the project in MS Project using MS Excel.
Making an Activity List in Microsoft Excel.
In MS Excel, add manpower and their productivity. Add duration to activities based on productivity.
Creating A Project In MS Project Importing All Activities From Excel To MS Project W.B.S. And Activity Relationships
Making and Allocating Resources to Activities (Work And Material Resources)
Update The Project Based On Actual (Time And Cost)
Excel Training for Novices
Because Excel is essential for this course, I’ve included basic Excel training and formulas for those who are new to the program.
AutoCAD Instruction
Because Auto-cad is also required for this course, I have included Auto-cad training for those who are new to Auto-cad.
More from Categories : Everything Else